Resolve the question before the renovation starts
A renovation can involve material beyond the surface you planned to replace. Explain the proposed work before demolition, a strip-out or other disturbance begins, so the assessment covers the parts of the property that may be affected.
Australia’s Asbestos and Silica Safety and Eradication Agency advises householders to check for asbestos before renovation and avoid disturbing or damaging suspected material. Use professional assessment; photographs or the age of a building alone do not confirm what a material contains.
If unexpected material appears during the work
Stop the affected work and keep people away from the area. Do not handle the material, sweep it up or use a household vacuum on suspected debris. Arrange advice from an asbestos professional before anyone disturbs it further.
Tell the builder or project coordinator where it was found and share the current scope and existing reports. The material needs assessment before the affected work resumes. Agree any change to removal, clearance, cost and timing with the responsible professionals.
Confirm who assesses, removes and clears
Assessment, removal and any required clearance are different responsibilities. Ask who will carry out each part, which licence-holder is responsible for the removal and which documents you should receive. Existing reports may need to be checked against the work now proposed.
We coordinate asbestos removal and the specialists needed for your project. Confirm the responsible licence-holder, assessment and clearance providers before work begins.
Allow for asbestos in the demolition sequence
For demolition work in NSW, SafeWork identifies asbestos assessment as part of planning and requires asbestos to be removed before structural demolition. Where an asbestos register is unavailable, a competent person must inspect the structure for asbestos.
Tell the demolition contractor about known or suspected material early. Agree how the findings affect the removal scope, specialist work, disposal and timing before the structural work is scheduled. If new material is found, have the appropriate professionals assess the change.
Ask what you will receive at handover
Make removal boundaries and retained areas clear before work begins. Ask which assessment, disposal and clearance records apply to the project, who supplies them and when they will be available to the next contractor.
Keep those records with the property’s project documents. If later renovation work affects a different area, share the records but do not assume they cover material outside the earlier scope.
Common questions
Can a photo confirm whether something contains asbestos?
No. A photo can help explain the location and proposed work, but it does not establish the material’s composition. Arrange professional assessment and avoid disturbing suspected material in the meantime.
Can I enquire before I have a report?
Yes. Explain what is suspected and what work you are planning. We can discuss the assessment and coordination needed before a removal scope is agreed.
Is asbestos removal only available with a full demolition?
No. We can discuss asbestos removal for a standalone job, renovation or demolition. The scope and specialist requirements depend on the material and the proposed work.